Shandong Guoshun Construction Group Co., Ltd. Industrial Smoke Ultra low Emission Control Equipment Manufacturing Spray Coating Process Technology Transformation (Spray Coating Center) Project Environmental Impact Assessment Second Public Announcement
2024-11-21 16:47:43
The Environmental Impact Assessment Report (Draft for Comments) for the Industrial Smoke Ultra low Emission Control Equipment Manufacturing and Spraying Process Technology Transformation (Spraying Center) Project of Shandong Guoshun Construction Group Co., Ltd. has been completed. In accordance with the "Public Participation Measures for Environmental Impact Assessment" (Order No. 4 of the Ministry of Ecology and Environment), the project is now being publicly announced for the second time to widely understand the public's attitude towards the proposed project and their opinions and suggestions on environmental protection, and to accept public supervision.
1、 Project Overview
1. Project Name: Industrial Smoke Ultra low Emission Control Equipment Manufacturing Spray Coating Process Technology Transformation (Spray Coating Center) Project;
2. Construction unit: Shandong Guoshun Construction Group Co., Ltd;
3. Construction location: No. 001 Guoshun Road, Economic Development Zone, Jinan City, Shandong Province;
4. Project Overview: The construction unit will utilize its own production workshop of 20750 square meters, upgrade and renovate the existing spraying production line, and reconfigure the painting process for panels and profiles. The original production process was to spray one coat of oil-based primer. After the technological transformation, the spraying process for some components was changed to one coat of oil-based primer, oil-based intermediate paint, and oil-based topcoat, while increasing the spraying thickness; The spraying process for other components has been changed to water-based paint spraying. In addition, after the completion of the technological transformation, the spraying production line will be opened to the public in the form of a spraying center, which will undertake spraying operations for similar enterprises with similar spraying needs in the surrounding area.
2、 How to access the Environmental Impact Assessment Report
The full draft of the Environmental Impact Assessment Report for soliciting opinions is attached; Paper reports can be queried and consulted by contacting the construction unit (contact person: Manager Wen 15264136612) or the environmental impact assessment agency (contact person: Ma Gong 17863560809).
3、 Public scope for soliciting opinions
Citizens, legal persons, and other organizations within a radius of 1.0km from the proposed project site.
4、 Public Opinion Form
The public opinion form is attached.
5、 Ways and channels for the public to express their opinions
If the public has environmental protection opinions on construction projects, they can do so by phone (contact person of the construction unit: Manager Wen 15264136612) or email during the consultation period( 1424683038@qq.com )Submit to the construction unit.
Attachment 1: Draft for Comments (link:) https://pan.baidu.com/s/1zN63uNKjvAvjpCpYs1NaGQ?pwd=lbxy Extraction code: lbxy)
Attachment 2: Public Consultation Opinion Form (link: https://pan.baidu.com/s/1TzhSdFbyWnYL_w-i5fQyUw?pwd=7h1u Extraction code: 7h1u)
Shandong Guoshun Construction Group Co., Ltd
November 14, 2024
推荐新闻
2024-11-21
Shandong Guoshun Construction Group Co., Ltd. Industrial Smoke Ultra low Emission Control Equipment Manufacturing Spray Coating Process Technology Transformation (Spray Coating Center) Project Environmental Impact Assessment Second Public Announcement
2024-11-14
Guoshun Group Becomes the First Chinese Company to Achieve ACRS 3679.2 Certification, Expanding its Presence in the International Market
2024-11-13
News | Shandong Guoshun Jiugang Operation Project Department has won high praise from customers!